Re: [The Smiler] Construction Updates and Ride Speculation Part 2
Evening Peops: Towers Nerd were on spark today. Some construction pics for you to gander.
More theming added to the Smiler. Hmm maybe that construction guy needs to be corrected:
Like this guy who is far happier in his Job, but whats that they are using to stick the ride together with?
Zooming in its.. Bathroom sealant?
Ever wondered what the world looks like through the Smiler Operators glasses? Something like this:
The bases of the legs now all have their names on them:
Want a close up of those logos on the bins and barrels? Well you got one:
Whilst were on closeups. Have any of you noticed that the base of the Marmalisor has a sign on it. Ever wondered what that sign says?
There has been some debate on whether the Car Wash (Tickler) will actually spin. I think I can lay this one to rest:
But lets start a new debate: What are these cables for on the satellite dishes?
So on to the theming of the station. This is how the pipes are added. Lots of measurements and funky clasps.
And a few minutes later, those clasps are filled with this lovely bit of pipe:
So the full pipe work added before it started raining today looks something like this:
The HB Leisure unit is coming along swimmingly:
Whilst looking at the HB Unit we noticed this flying piece of machinery. Very clever:
My usual overview:
Ooo I can look into the shop from here:
Meanwhile, back at the top They are.. WHAT CUTTING INTO THE SUPPORTS?
By the end of the day rain was poring down and the top end looks something like this:
Or this (look how much it was raining):